RaThun 49.2ft Star Fairy String Lights 100 LED Warm White,16ft Long Lead,Remote Timer 8 Modes,UL Certified IP44 Waterproof Plug-in Linkable for Patio Wedding Bedroom Christmas

★★★★★ 5.0 117 reviews

US$5.54
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by icmarchitectures.com
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$5.54
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Sep 5
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by icmarchitectures.com
Free 30-day returns Details

Product details

Management number 247841700 Release Date 2026/08/16 List Price US$5.54 Model Number 247841700
Category
  • Remote Timer & 8 Adjustable Lighting Modes: You hate standing up repeatedly to adjust lights, and single static light modes can’t match different occasions.Our star fairy lights are equipped with a full-function remote, supporting 8 switchable light effects, brightness adjustment and auto timer setting in one click without unplugging. Unlike cheap lights without timing control, it creates varied soft starry atmosphere automatically.Suitable for home decor lovers & party planners. Great for bedroom ambient lighting, backyard gatherings, classroom holiday decor and romantic wedding receptions.
  • 49.2ft Total Length with Extra 16ft Extended Lead Wire: Short light cords cannot reach distant outdoor outlets, extra extension cords cause messy wiring and extra costs.Combined with 33ft main light string + exclusive 16ft extended lead wire, total length reaches 49.2ft. No extra extension cords required to wrap trees, fence lines and patio railings. Multiple sets can be connected to cover large spaces freely.Suitable for homeowners & storefront operators. Ideal for porch decoration, garden landscaping, shop window display and large wedding venue layout with tidy wiring.
  • 100 Star LEDs, Low Power & Anti-Glare Soft Warm Glow: Dislike glaring transparent bulbs that ruin your cozy relaxing mood? Equipped with 100 bubble-shaped star LEDs, the special bubble shell diffuses light evenly for gentle warm white glow with zero sharp glare. Energy-saving low-power design cuts electric bills, cool light source won’t strain eyes for long-time viewing. Shatter-resistant bubble star covers are more durable than thin plastic cheap lights.Suitable for family households & reading lovers. Perfect for Xmas tree ornaments, apartment balcony rest nooks and study soft supplementary lighting.
  • UL Certified IP44 Waterproof, Cool Touch Safe for Household & Pets: Worry about uncertified lights with fire risks, hot bulbs scalding family members or pets, and ordinary lights damaged by rain outdoors? This string light gains UL safety certification and IP44 weatherproof rating to resist light rain and daily damp all year round. Bubble star shells stay cool after long hours of operation, shatterproof structure avoids injury risks for household use and pets. Safe for indoor & outdoor all-season use.Ideal for pet owners and garden party hosts. Can be hung on lawns, covered patios, balconies and living rooms all year.
  • Plug & Play Linkable Design for Large Commercial & Event Decor: Struggle with single short strands unable to cover large venues and flimsy connectors hard to splice? Adopts plug-and-play design with stable male and female plugs, seamlessly linking multiple sets within minutes without complicated tools. Create continuous bubble star lighting layouts for wide-range decoration easily.Fit wedding designers and mall decorators. Great for wedding aisles, villa garden full lighting, holiday block parties and retail storefront decoration.

ASIN B0G922CGBM
Color Warm White
Theme Christmas
Voltage 29 volts
Wattage 24 watts
Occasion All seasons, Christmas
Brand Name RaThun
Unit Count 49.2 Feet
Form Factor String Lights
Item Length 49.2 feet
Light Color Warm White
Manufacturer NINGBO GOLDEN POWER ELECTRONIC CO LTD
Model Number GP-SW290DC0248-IP44(US)A
Power Source Corded Electric
Material Type Plastic
Product Style Modern
Number of Items 1
Color Temperature 2700 Kelvin
Light Source Type LED
Additional Features Dimmable, Timer
Included Components Light kit inlcuded
Indoor Outdoor Usage Indoor, Outdoor
Water Resistance Level Water Resistant
hanging_pattern_layout Linear
Number of Light Sources 100
Manufacturer Part Number GP-SW290DC0248-IP44(US)A
Ingress Protection Code Rating IP44
Manufacturer Warranty Description 1-year warranty.

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

5 out of 5
★★★★★
117 ratings | 48 reviews
How item rating is calculated
View all reviews
5 stars
90% (105)
4 stars
0% (0)
3 stars
0% (0)
2 stars
0% (0)
1 star
10% (12)
Sort by

There are currently no written reviews for this product.